Project record · 2025
Old Simulator Building upgrade — Eskom power station
Renovation and refurbishment of the old simulator building at an Eskom power station, executed under a full construction safety file.
| Client | Eskom Holdings SOC Ltd |
|---|---|
| Sector | Power generation |
| Location | Mpumalanga |
| Role | Contractor |
| Reference | Signed contract and agreed quotation on file |
| Period | March – April 2025 |
Evidence held on file: Signed contract; project programme; budget reports; safety file.. Contract value available to prospective clients on request.
Scope of work
- Building renovation and refurbishment of the old simulator building.
- Construction safety file with fall-protection plan, competent-person appointments and task risk assessments.
- Programme and budget reporting through the contract period.
Method and quality
Outcome
Refurbishment completed within the March–April 2025 programme.
Services delivered on this project
ConstructionConstruction & Building Works
Building refurbishment, concrete paving and stormwater drainage, and general building works on operating industrial sites under CIDB 7GB and 7CE gradings and NHBRC registration, with a full construction safety file.
Service details →
Project managementContracts, Project Management & Technical Advisory
Contract administration, outage planning, site supervision and close-out under Eskom and NEC-based contract forms — including Main Contractor appointments under the OHS Act — with quality control plans and data books that survive audit.
Service details →More project records
Slurry plant rubber lining
Replacement and internal rubber lining of the AWRSE tank outlet pipework to slurry Mixers A, B and C, and rubber lining of the slurry plant mixers, delivered as Main Contractor with a full data book.
Eskom Holdings SOC Ltd · 2025–2026
Read the project record →Conveyor pulley manufacture
Eighteen conveyor pulleys manufactured to Eskom drawing under a quality control plan counter-signed by Eskom Quality Assurance before manufacture began, together with bearings, pillow blocks, idler frames and drive components.
Eskom Holdings SOC Ltd · 2024–2025
Read the project record →EVAPCO cooler refurbishment
Refurbishment of three closed-circuit evaporative coolers, restoring the fan and motor drive trains to service.
Eskom Holdings SOC Ltd · 2024
Read the project record →Technical background to this work
The reviewed articles behind the method used on this job.
Building a shutdown scope a contractor can price: QCPs, hold points, data books and what Eskom returnables require
An outage scope that cannot be priced properly is executed badly. This article sets out what a plant should put in front of a contractor, what the contractor should return, and how quality control plans, hold points and data books keep the work honest from award to close-out.
Reviewed by the Operations Manager · September 2026
Read the article →Have a similar scope?