Home › Projects › Workshop & pumps-maintenance resources

Project record · 2025–2026

Workshop services and supervised maintenance resources — Eskom pumps maintenance

Provision of supervised workshop and maintenance resources on a three-shift rotation, with a site supervisor, rosters, medicals and access management.

CoverThree-shift rotation
SupervisionDedicated site supervisor
DurationA full contract year
OutcomeContract renewed
✓ Verified from company records
ClientEskom Holdings SOC Ltd
SectorPower generation
LocationMpumalanga
RoleContractor — supervised resources
ReferenceWorkshop services and resources contract; renewed December 2025
PeriodJanuary 2025 – January 2026

Evidence held on file: Appointment letters; rosters; inspection reports; contract renewal December 2025.. Contract value available to prospective clients on request.

Scope of work

  • Supervised workshop and maintenance resources for the pumps maintenance section.
  • Three-shift rotation with a dedicated site supervisor.
  • Rosters, medical surveillance and plant access management for all personnel.

Method and quality

ManagementAppointment letters, shift rosters and inspection reports maintained through the contract; contract renewed in December 2025.

Outcome

Resources supplied continuously for the contract year and the contract renewed.

Services delivered on this project

Refurbished split-case pump ready for return to siteMechanical

Mechanical & Rotating Equipment Maintenance

Planned, outage and breakdown maintenance on operating plant — coolers, pumps, conveyors, drives and their structures — under permit-to-work, with supervised resources when a section needs them for a year.

Service details →
Umbusso Engineers crew installing a site pipeline and pump setProject management

Contracts, Project Management & Technical Advisory

Contract administration, outage planning, site supervision and close-out under Eskom and NEC-based contract forms — including Main Contractor appointments under the OHS Act — with quality control plans and data books that survive audit.

Service details →

More project records

Verified from records

Slurry plant rubber lining

Replacement and internal rubber lining of the AWRSE tank outlet pipework to slurry Mixers A, B and C, and rubber lining of the slurry plant mixers, delivered as Main Contractor with a full data book.

Eskom Holdings SOC Ltd · 2025–2026

Read the project record →
Verified from records

Conveyor pulley manufacture

Eighteen conveyor pulleys manufactured to Eskom drawing under a quality control plan counter-signed by Eskom Quality Assurance before manufacture began, together with bearings, pillow blocks, idler frames and drive components.

Eskom Holdings SOC Ltd · 2024–2025

Read the project record →
Verified from records

EVAPCO cooler refurbishment

Refurbishment of three closed-circuit evaporative coolers, restoring the fan and motor drive trains to service.

Eskom Holdings SOC Ltd · 2024

Read the project record →

All projects

Have a similar scope?

Tell us the plant, the equipment and the window. We will come back with questions, a site-visit date or a priced quotation with a quality plan outline.

Office +27 17 007 0135  ·  WhatsApp +27 72 535 1598  ·  info@umbussoengineers.co.za

info@umbussoengineers.co.za

Office hours: Monday to Friday, 09:00 to 16:00

Trichardt, Mpumalanga

2 Bekker Street, Trichardt, 2300, Mpumalanga