Verified from records

Slurry plant rubber lining

Replacement and internal rubber lining of the AWRSE tank outlet pipework to slurry Mixers A, B and C, and rubber lining of the slurry plant mixers, delivered as Main Contractor with a full data book.

Eskom Holdings SOC Ltd · 2025–2026

Read the project record →
Verified from records

Conveyor pulley manufacture

Eighteen conveyor pulleys manufactured to Eskom drawing under a quality control plan counter-signed by Eskom Quality Assurance before manufacture began, together with bearings, pillow blocks, idler frames and drive components.

Eskom Holdings SOC Ltd · 2024–2025

Read the project record →
Verified from records

EVAPCO cooler refurbishment

Refurbishment of three closed-circuit evaporative coolers, restoring the fan and motor drive trains to service.

Eskom Holdings SOC Ltd · 2024

Read the project record →
Verified from records

Simulator building upgrade

Renovation and refurbishment of the old simulator building at an Eskom power station, executed under a full construction safety file.

Eskom Holdings SOC Ltd · 2025

Read the project record →
Verified from records

Workshop & pumps-maintenance resources

Provision of supervised workshop and maintenance resources on a three-shift rotation, with a site supervisor, rosters, medicals and access management.

Eskom Holdings SOC Ltd · 2025–2026

Read the project record →
Verified from records

Water-tank structural work

Installation and modification of structural steel beams inside a water tank, with scaffolding, under confined-space controls.

Eskom Holdings SOC Ltd (under the main contractor) · 2022

Read the project record →
Verified from records

Plant drains cleaning

Cleaning and unblocking of plant drains under an approved method statement with confined-space and permit-to-work controls.

Eskom Holdings SOC Ltd

Read the project record →
Verified from records

Conveyor gearbox repairs

Repair of two main coal conveyor gearboxes, including the manufacture of a new output shaft to drawing.

Eskom Holdings SOC Ltd (via the main contractor) · 2017

Read the project record →
Verified from records

Surveillance network & maintenance

A series of six Eskom orders for CCTV maintenance, surveillance network infrastructure, CAT6 structured cabling re-routing and remote monitoring of intrusion systems, followed by access-control and surveillance diagnostics in 2023.

Eskom Holdings SOC Ltd · 2021–2023

Read the project record →
Verified from records

Camera & flow-meter installation

Supply and installation of one PTZ camera, sixteen fixed IP cameras across the east and west fuel oil plant, and four Helix rotor flow meters.

Eskom Holdings SOC Ltd · 2021

Read the project record →
Verified from records

Concrete paving & drainage

Concrete paving and stormwater drainage works delivered as subcontractor on an Eskom site.

Eskom Holdings SOC Ltd (under the main contractor) · 2020

Read the project record →

Every record on this page is written from a purchase order, contract, appointment letter, completion certificate or site report held on file. Contract values are omitted from the website and available to prospective clients on request.

Discuss a similar scope

Tell us the plant, the equipment and the window. We will come back with questions, a site-visit date or a priced quotation with a quality plan outline.

Office +27 17 007 0135  ·  WhatsApp +27 72 535 1598  ·  info@umbussoengineers.co.za

info@umbussoengineers.co.za

Office hours: Monday to Friday, 09:00 to 16:00

Trichardt, Mpumalanga

2 Bekker Street, Trichardt, 2300, Mpumalanga